CA InterProcess costing - equivalent production of transferred-in material
How is Material A treated in this question, and what is its percentage in equivalent production?
BrunoAI answer
Material A in Process III is the 47,700 units transferred in from Process II, i.e. the previous process cost. Transferred-in units arrive fully complete for that cost, so Material A is always 100% except for opening WIP. 1. Opening WIP (1,800): 0%. Its Material A cost was already incurred last month, and under FIFO only this month's work is counted. 2. Introduced and completed (41,400): 100%. 3. Closing WIP (4,500): 100%, because these units have already come in from Process II. 4. Normal loss (2,250): nil. Abnormal gain (450): 100%, deducted. Equivalent units = 41,400 + 4,500 − 450 = 45,450. Cost = 5,36,625 − scrap value of normal loss (2,250 × 6.75 = 15,187) = 5,21,438. Cost per unit = 5,21,438 ÷ 45,450 = 11.4728. Material B is different: it is added in Process III, so its percentages follow the degree of completion given (opening 20%, closing 70%).
Read full answer →
1 answer 17 Nov 2026